ALGORITHMIC MAINTENANCE OF WKS SUPPORT FOR VOLUME SCHEDULING IN PIPE PRODUCTION
https://doi.org/10.17073/0368-0797-2016-7-504-509
Abstract
Approaches to solving the central problem of the highest hierarchical
level of industrial complex management system are conside red. This is the problem of choosing the strategy of volume schedu ling (VC) of pipe production: production to the “warehouse” or production “order”. Each strategy can be characterized by the specific risks of expected revenues losses. The solution of the procedure of forming the optimal structure of the production program (portfolio of orders) is presented. Adequate implementation of this procedure signifi cantly aff ects the performance of the pipe business. This applies primarily to the shops with the multiproduct production of cold deformed pipes. Production logistics in such shops is based on the use of various combinations of technological routes (rolling, broaching, heat treatment, chemical treatment, etc.). The solution was implemented in the form of multicriterial selection process. Decrease in the dimension of optimization problems of VC was implemented using techniques of assortment aggregation of the pipe shop. The technique is based on the algorithm of the synthesis method of principal components factor analysis and automatic classifi cation. Coordination of the production process and the departure sequence of finished products to custo mers were made via an interactive multicriteria iterative procedure. The author has used the method of interval estimation of the substitution criteria, adequate to functionality of the actual users of the services that does not have special training in the theory of decision making.
About the Author
S. Ya. FominRussian Federation
Dr. Sci. (Eng.), Professor of the Chair of Automation Control Systems (ACS)
References
1. Zhirnov V.I. Enterprise production management in a changing market environment. In: Upravlenie bol’shimi sistemami: Sb.dokl. 6-i shkoly-konferentsii molodykh uchenykh [Managing of large systems: References of 6 th School-conference of young scientists]. Part. 1. Izhevsk: Izd-vo Udmurt. gos. Un-ta, 2009, pp. 171-178. (In Russ.).
2. Golokteev K.N., Matveev I.A. Upravlenie proizvodstvom: instrumenty, kotorye rabotayut [Production management: tools that work]. St. Petersburg: Piter, 2008, 251 p. (In Russ.).
3. Mauergauz Yu.E. Kriterii kachestva proizvodstvennogo planirovaniya i ikh prioritety dlya raznykh urovnei planovoi ierarkhii [Criteria for quality of production planning and priorities for diff erent levels of planning hierarchy]. Available at URL: http://www.erpnews.ru. (In Russ.).
4. Emel’yanov A.A. Imitatsionnoe modelirovanie v upravlenii riskami [Simulation modeling of risk management]. St. Petersburg: Spb- GIEA, 2000, 376 p. (In Russ.).
5. Logistika [Logistics]. Anikina B.A. ed. Moscow: INFA, 2004, 368 p. (In Russ.).
6. Volgin V.V. Sklad. Logistika, upravlenie, analiz [Warehouse. Logistics, management, analysis ]. Moscow: Dashkov i Ko. 2007, 376 p. (In Russ.).
7. Ivanova O.S., Zhirnov V.I. Model of optimal production plan in the framework of enterprise management information system. In: Nauka. Tekhnologii. Innovatsii: Materialy vseros. Nauchn. konf. molodykh uchenykh [Science. Technology. Innovations: Proc. of All-Russian Sci. Conf. of young scientists]. Novosibirsk: Iz-vo Novosib. gos. tekh. un-ta, 2007, pp. 42–46. (In Russ.).
8. Zhirnov V.I. Stolbov V.Yu. The model of an optimum production plan as an element of decision making support at the strategic level of enterprise management. In: Teoreticheskie i prikladnye aspekty informatsionnykh tekhnologii: sb. nauch. trudov [Theoretical and applied aspects of information technology: Coll. of sci. works]. Perm: GosNIIUMS, 2007, Issue 56, pp. 87-96. (In Russ.).
9. Falileev I.L., Malyshev G.I., Fomin S.Ya. Structuring of an optimal production program of pipe enterprise. Chernaya metallurgiya. Byul. in-ta “Chermetinformatsiya”. Moscow: OAO “Chermetinformatsiya”, 1989, no. 12, pp. 66–67. (In Russ.).
10. Fomin S.Ya. The stages of formalizing of developing procedure for organizational and technological classifi er for mix pipe factory aggregation. In: Matematicheskoe modelirovanie: Trudy MISiS, [Mathematical modeling: Proceedings of MISiS]. Moscow: MISiS, 1990, pp. 117–124. (In Russ.).
11. Dubrov A.M. Obrabotka statisticheskikh dannykh metodom glavnykh component [Processing of statistical data by the method of principal components]. Moscow: Statistika, 1978, 124 p. (In Russ.).
12. Chernorutskii I.G. Metody prinyatiya reshenii [Methods of decision-making]. St. Petersburg: BKhV-Peterburg. 2005, 416 p.
13. Minieka Edward. Optimization Algorithms for Networks and Graphs. Marcel Dekker, New York, 1978, 356 p. (Russ.ed.: Minieka E. Algoritmy optimizatsii na setyakh i grafakh. Moscow: Mir, 1981, 323 p.).
14. Fomin S.Ya. Intermodule optimization method adequate to interactive operator command for computer – aided manufacturing (CAM) complex. Izvestiya VUZov. Chernaya metallurgiya = Izvestiya. Ferrous Metallurgy. 2011, no. 5, pp. 58–65. (In Russ.).
Review
For citations:
Fomin S.Ya. ALGORITHMIC MAINTENANCE OF WKS SUPPORT FOR VOLUME SCHEDULING IN PIPE PRODUCTION. Izvestiya. Ferrous Metallurgy. 2016;59(7):504-509. (In Russ.) https://doi.org/10.17073/0368-0797-2016-7-504-509