APPLICATION OF THE TIMING MODEL IN REENGINEERING OF THE PRODUCTION SYSTEMS IN METALLURGY
https://doi.org/10.17073/0368-0797-2015-5-367-375
Abstract
The problem of creation of the timing model for difficult production systems and their application in reengineering of ferrous metallurgical enterprises are considered. The classification of timing models was carried out by their appointment, scale of the research object, degree of continuity of a material stream, quantity of simultaneously processed semi-products, number of production operations, importance of the equipment, statistical characteristics of a time step, extent of mechanization and automation of the equipment, by an entrance and an exit of a material stream. The leading role of the indicator “productivity” and its connection with other technical and economic indicators of a production system was shown. The factorial model of system capacity is given and the fundamental factor, namely a time step of system, is allocated. The basic formula for the estimation of productivity was offered on the basis of a time step. The technique of identification of “bottlenecks” of a production system on the basis of a timing approach and an assessment of actions efficiency of reengineering is shown. The example of the application of timing models for the analysis of “bottlenecks” in rolling production is given. Possibility of timing models application is noted for planning, forecasting and operational management of production.
About the Authors
S. M. KulakovRussian Federation
Dr. Sci. (Eng.), Professor, Head of the Chair “Automation and Information Systems”
A. I. Musatova
Russian Federation
Assist. Professor of the Chair of corporate economics and personnel management
V. N. Kadykov
Russian Federation
Cand. Sci. (Eng.), Assist. Professor of the Chair “Metal Forming and Metal Science”, OJSC “EVRAZZSMK”
P. P. Baranov
Russian Federation
Dr. Sci. (Economics), Assist. Professor, Director of the Institute of Economics and Management
References
1. Šnapka P., Mikušová M., Janovská K., Samolejová A. Simulation model of metallurgical production management. Metalurgija. 52 (2013) 2, pp. 429–431.
2. Medikov V.Ya. Proizvodstvennye moshchnosti i ikh ispol’zovanie [Production capacity and its usage]. Moscow: MGUP, 2002. 264 p. (In Russ.).
3. Mets A.F., Shtets K.A., Bel’gol’skii B.P., Shchepilov F.I. Organizatsiya i planirovanie predpriyatii chernoi metallurgii: Uchebnik [Arrangement and planning of ferrous metallurgy enterprises: Textbook]. Moscow: Metallurgiya, 1986. 560 p. (In Russ.).
4. Serovatin A.I. Raschet proizvoditel’nosti oborudovaniya prokatnykh tsekhov [Equipment performance calculations of rolling-mill shops]. Moscow: Metallurgiya, 1970. 96 p. (In Russ.).
5. Dušan Malindžak, Andrzej Gazda. The principles and specifics of logistics of metallurgical production. Metal. 2011, no. 5, pp. 18–20.
6. Radim Lenort, Jezy Feliks. Production logistics concepts and systems in metallurgical companies. Metal. 2013, no. 5, pp. 15–17.
7. Musatova A.I., Kulakov S.M., Kadykov V.N. Operating Cycles of Automated Production Systems. Steel in translation. 2003. Vol. 41, no. 4, pp. 294–300.
8. Kadykov V.N., Kulakov S.M., Musatova A.I. Algorithmization of estimation of situational time steps of a rolling complex. Izvestiya VUZov. Chernaya metallurgiya = Izvestiya. Ferrous Metallurgy. 2011, no. 8, pp. 61–69. (In Russ.).
9. Musatova A.I., Kulakov S.M. Construction peculiarities of a normative performance model of draw benches. Nauchnoe obozrenie. 2014, no. 3. pp. 139–149. (In Russ.).
Review
For citations:
Kulakov S.M., Musatova A.I., Kadykov V.N., Baranov P.P. APPLICATION OF THE TIMING MODEL IN REENGINEERING OF THE PRODUCTION SYSTEMS IN METALLURGY. Izvestiya. Ferrous Metallurgy. 2015;58(5):367-375. (In Russ.) https://doi.org/10.17073/0368-0797-2015-5-367-375